⌂  /  Scaffolding & Formwork  /  Metal Boards & Scaffold Planks
Scaffolding & Formwork

Metal Boards &
Scaffold Planks

Excel metal boards and laminated LVL boards provide working-platform and access surfaces in scaffold and temporary access arrangements, with multiple catalog-listed lengths.

Excel metal boards and scaffold planks
Working-platform boardsMetal and laminated LVL options
Six listed lengths1000 mm through 4000 mm
Access-system integrationFor scaffold and temporary platform arrangements

Board & Plank Range

Catalog-defined board, plank and related long-span support options.

Excel metal scaffold board
01

METAL BOARDS

Steel scaffold boards for working platforms and access arrangements.

Metal board range
Excel scaffold board with end hook
02

SCAFFOLD BOARD WITH END HOOK

Hooked scaffold board for positive platform location in frame and tower systems.

Hooked platform board
Excel board platform family
03

LAMINATED BOARDS (LVL)

Laminated board family listed alongside metal boards for temporary working platforms.

Catalog board family
Excel scaffold unit beam
04

UNIT BEAM

Deep trussed unit beam for long-span temporary roofs and support applications.

Long-span support beam

How Boards Are Used

Boards and planks form working surfaces within the scaffold or access configuration.

01Select Length

Choose the board length to suit the scaffold bay or platform.

›
02Place the Board

Install the board within the working-platform arrangement.

›
03Secure the Platform

Use the applicable frame or scaffold retaining components.

›
04Complete Access Surface

Integrate boards with the surrounding access and guard system.

Applications

Product-specific applications using Excel system components and configurations.

Excel steel scaffold board working platform
Working PlatformsSteel scaffold boards create stable working platforms for access scaffolds.
Excel scaffold board with end hook
Hooked Platform BoardsEnd-hook boards provide positive location on frame and tower systems.
Excel walk-through scaffold platform
Walk-Through AccessPlatform components support clear passage and elevated work access.
Excel scaffold unit beam
Long-Span Temporary StructuresUnit beams support long-span temporary roof and access arrangements.

Technical Information

Catalog-listed metal/LVL board sizes and related Unit Beam information.

ProductCatalog Size
Metal / LVL Board1000 × 225 × 38 mm
Metal / LVL Board1500 × 225 × 38 mm
Metal / LVL Board2000 × 225 × 38 mm
Metal / LVL Board2500 × 225 × 38 mm
Metal / LVL Board3000 × 225 × 38 mm
Metal / LVL Board4000 × 225 × 38 mm
Unit Beam2400 mm / 8'-0"
Unit Beam3600 mm / 12'-0"
The catalog states that Unit Beams have a 0.60 m depth measured centre-to-centre of the horizontal tube, can be bolted end-to-end, and other sizes are available to customer request.
Excel metal boards and scaffold planks

Why Choose Excel Boards & Planks

Metal & LVL OptionsTwo board families are identified in the Excel catalog.
Six Board LengthsCatalog-listed lengths from 1000 mm to 4000 mm.
Platform IntegrationBoard options support scaffold and temporary working surfaces.
Long-Span Unit BeamsRelated trussed Unit Beams are available for long-span temporary-roof use.

Need Scaffold Boards or Planks?

Talk to Excel’s Scaffolding & Formwork team about board lengths, LVL options and access-platform requirements.